Better Small Municipal Garbage Incinerator Plant for Urban Refuse Treatment

Product Details
Customization: Available
Type: Incinerator
Capacity: 10-500kg/Batch

360° Virtual Tour

Diamond Member Since 2012

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

to see all verified strength labels (23)
  • Better Small Municipal Garbage Incinerator Plant for Urban Refuse Treatment
  • Better Small Municipal Garbage Incinerator Plant for Urban Refuse Treatment
  • Better Small Municipal Garbage Incinerator Plant for Urban Refuse Treatment
  • Better Small Municipal Garbage Incinerator Plant for Urban Refuse Treatment
  • Better Small Municipal Garbage Incinerator Plant for Urban Refuse Treatment
  • Better Small Municipal Garbage Incinerator Plant for Urban Refuse Treatment
Find Similar Products

Basic Info.

Model NO.
WSZ
Color
Customized
Fuel
Natural Gas/Diesel
Voltage
220V/380V
Transport Package
Customized
Specification
carbonsteel
Trademark
BETTER
Origin
China
Production Capacity
600sets/Year

Product Description

Better Small Municipal Garbage Incinerator Plant for Urban Refuse Treatment
We aim to work with every customer on an individual basis and provide you with top-quality service and the products you desire for your environment. 
Better Small Municipal Garbage Incinerator Plant for Urban Refuse Treatment

Description
WFS series waste incinerator is a kind of machine that possess the own intellectual property, features unique and advanced merits with compact size, high burning efficiency, automatic-control, reasonable burning technology, high degree of non-harm etc. It is an ideal choice for waste treatment of hospital, hotels, various stations and industries.


Better Small Municipal Garbage Incinerator Plant for Urban Refuse TreatmentBetter Small Municipal Garbage Incinerator Plant for Urban Refuse Treatment
model WFS-30 WFS-50 WFS-150 WFS-300 WFS-500
Burning capacity 20-30kg/time (3-6 times/day) 30-50kg/time(3-6times/day) 100-150kg/time (3-6times/day) 200-300kg/time (3-6times/day) 300-400kg/time
(3-6times/day)
incinerator Size   m (L*H*B) 1.45*0.9*1.75 1.8*1.15*3 2*1.4*3.5 2.2*1.4*3.8 3*2*4.8
imputing mouth width (mm) 480*600 620*800 760*960 900*1100 1080*1280
Chimney external diameter (mm) 280 280 300 400 460
draught fan 0.25w 0.25w 0.37w 0.55kw 0.55kw
Combustion improver device 0.12kw
Oil consumption: 4-6kg/h
0.12kw
Oil consumption: 4-10kg/h
0.18kw
Oil consumption: 4-10kg/h
0.18kw
Oil consumption: 7-14kg/h
0.25kw
Oil consumption:

 7-14kg/h
Re-burning device 0.18kw
Oil consumption 4-6 kg/h
0.18kw
Oil consumption: 4-10kg/h
0.25kw
Oil consumption: 7-14kg/h
0.25kw
Oil consumption: 10-20kg/h
0.25kw
Oil consumption:

 15-26kg/h
voltage 380v/220v 380v/220v 380v/220v 380v/220v 380v/220v
Weight(kg) 2300 4000 7000 8000 13000

Main features
1, Fuel: Diesel/LPG/Natural gas 

2, Gasified incineration is used for infectious medical waste, animal carcass, poultry leather, daily garbage, disposable waste, plastic waste etc.
3, Daily waste can be burned once by gasified incineration.
4, Gasified incineration, mixed incineration and burnout treatment ensures low emission standard of dust (lower than International standard).
5, Totally enclosed operation is suitable for treating infectious waste to avoid secondary pollution.


 Widely Application: 
1.Infectious medical waste.
2.Animal carcass/ dead body, poultry leather, etc.
3.Daily/domestic garbage/ rubbish.
4.Package waste.
5.Disposable plastic waste, like bottle, cup, bowl, tray.
6. Other solid waste

Better Small Municipal Garbage Incinerator Plant for Urban Refuse Treatment

secondary chamber
Our standard incinerator range is designed in a way that all exhaust gas has to pass through a secondary burner for complete re-burn of harmful gas components. Exhaust gases are then retained for a period of time at a high temperature (850 - 1200°C, depending on the application). This is what we call 'Basic' pollution control.
Dioxins, furans and similar gaseous components are only destroyed by :
Homogeneous high temperature (> 850°C)
Excess of oxygen (>6 %)
Sufficient residence time at high temperatures
Better Small Municipal Garbage Incinerator Plant for Urban Refuse Treatment
Better Small Municipal Garbage Incinerator Plant for Urban Refuse Treatment
Better Small Municipal Garbage Incinerator Plant for Urban Refuse Treatment
Technical Support:
1). 3D operation video
2). English manual book
3). Technical drawing
4). Experienced engineers guide

Better Small Municipal Garbage Incinerator Plant for Urban Refuse Treatment
BETTER manufactures incinerator for a number of different industries, and we specialize in designing reliable incinerator for the hospital, food, energy and marine industries. Our trained engineers have many years of experience, thus we are able to offer custom-made incinerators for a wide variety of sectors with very different needs.We are focused on new and innovative solutions for our incinerators and are committed to helping our customers solve different problem.
Where are our incinerators are being used?
You will see our range of medical incinerators located in hospitals and health clinics across the globe.

We have installations from Southeast Asia to the Middle East. Recently we have built and supplied hundreds of medical incinerators to the Africa for use in hospitals.
Why choose a Clinical Incinerator from our company?
we have provided solutions to health centers and health clinics around the globe for years - because our experience and skills in this sector are second to none.
Better Small Municipal Garbage Incinerator Plant for Urban Refuse Treatment
Better Small Municipal Garbage Incinerator Plant for Urban Refuse Treatment

We are more than happy to help you with any inquiry. Call us or send us an email, and we'll be ready to assist you.
  
1. Product warranty: Usually, our product warranty is 18 months after leaving factory or 12 months after installation.
2. Delivery time: It will depend on the product quantity. Our products are sold according to order. 
3. Installation: If the project needs our installation guidance, we can send our engineer and translator. The expenses shall be borne by the project owner. 
4, Terms of payment: L/C or T/T.
5, About the sample: we can give you delivery, you need to pay for this cost.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier