Large Capacity Solid Waste Garbage Incinerator
WFS series waste incinerator is based on Japanese technology, absorbing similar equipment at home and abroad, adopting the most advanced combustion mode of primary pyrolysis gasification + mixed combustion with surrounding air + secondary incineration + burnout treatment, with the maximum temperature of 1600 ºC, which can effectively burn virus and harmful substances.
Technical support
(1) 3D video guide
(2) Manual book in English
(3) Technical drawing
(4) Experienced engineers guidance and technical support
Advantages
(1)long life
(2)Totally enclosed operation
(3)Applicable to the treatment of various solid wastes
(4)No smoke, no residue
(5)Simple operation
(6)Small floor area
(7)Reasonable combustion technology
(8)Good combustion effect
Main Features
(2) Both gas-motivated and oil-motivated are all can be preferred according to customers' needs.
(4) Gasified incineration, mixed incineration and burnout treatment ensures low emission standard of dust, dioxin etc. (lower than International standard).
Packaging delivery
We are more than happy to help you with any inquiry. Call us or send us an email, and we'll be ready to assist you.
1.Q: Are you a factory or a trading company?
A: We are a factory and we have more than ten years of rich experience in manufacturing waste disposal equipment.
2.Q: Where is your factory? How do I get there?
A: Our factory is located at No. 1137, Zhucheng City, Shandong Province, China. About 2 hours away from Qingdao Airport. If necessary, we can pick you up and welcome to visit our factory.
3.Q: Do you have a minimum order quantity requirement?
A: There is no minimum order quantity, but if you order a large number of products, you can enjoy discounts.
4.Q: Do you have a certificate?
A: Yes, we have ISO and SGS certificates.
5.Q: Can you meet my special requirements for my products?
A: Yes, we have a professional design team. We can provide drawings according to your requirements.
6. Q: How to buy your creative products?
A: You can provide us with your garbage types and daily disposal (please contact us for more information).
7. Q: How to pay?
A: TT and L / C can be accepted, and TT will be preferred. Pay 30% deposit before production, and then pay 70% balance before loading with TT.
8. Q: What is the delivery time?
A: It depends on the order quantity. Generally speaking, the delivery time will be within 2 to 4 weeks.
9. Q: How to package products?
A: We use standard packaging. If you have special packaging requirements, we will package as required, but the cost will be paid by the customer.
10. Q: How to prevent equipment corrosion?
A: We use world-famous paints such as SigmaCoatings, PainBow, etc. More importantly, we strictly follow the standard process for painting.
11. Q: How do you manufacture equipment?
A: Our processing technology includes laser / plasma cutting, automatic welding, CNC cutting and bending.
12. Q: How to install the device after reaching the destination?
A: We will provide you with detailed illustrations. If necessary, we will send technicians to help you. However, visa fees, air tickets, accommodation, and wages will be paid by the buyer.
If you want to know more details about the product, please contact Donna!