ABOUT US
14 years old direct manufacture factory,
with 10 years export experience.
Cooperated with UNDP, Ministry of Health, and many govenment Projects.
Tehcnical Support:
1). 3D operation video
2). English manual book
3). Technical drawing
4). Experienced engineers guide
100% Guarantee of no black smoke
(10-500kgs/batch, customized) Fuel: Diesel Oil for Natural Gas or LPG
Why choose us
1. We consistent good quality with reasonable price.
2. Big company, good reputation, more reliable.
3. Delivery in time.
4. Over 14 years' experience since 2006.
5.Considerable after-sales service.
Our Services
1.24-hour a day, 365-day a year access to a toll-free health care professional hotline for questions and trouble-shooting assistance FREELY.
2.all year round on site installation and debugging service abroad with professional engineer guide and training.
Packing&Delivery
Packaging Details export seaworthy packag
Delivery within 20 days.
1. INCINERATOR OVERVIEW
WFS series of life and (medical) waste incinerator is ShanDong Better Environmental Protection Technology Co.Ltd,our company introduced the world's advanced incinerator technology, researched and organized technical experts,developed with independent intellectual property rights of garbage incineration equipment. The device is fully enclosed, with smallvolume, high burning efficiency, reasonable process, leading technology, high degree of harmless,etc, are the ideal garbage treatment equipment for all kinds of hospitals, hotels, railway stations, large commercial institutions.
2. ADVANTAGE
1) Long lifetime
2) Totally enclosed operation
3) Suitable for treating infectious waste
4) Avoid secondary pollution
5) Simple operation
6) Small size, small footprint.
3. MAIN FEATURES
1) Both gas-motivated and oil-motivated are all can be preferred according to customers' needs.
2) Gasified incineration is used for burning animal carcasses,syringe, paper waste, bandage, absorbent cotton and other medical wastes.
3) Daily waste can be burned once by gasified incineration.
4) Gasified incineration, mixed incineration and burnout treatment ensures low emission standard of dust (lower than International standard).
5) Totally enclosed operation is suitable for treating infectious waste to avoid secondary pollution.
4. APPLICATION
1) All kinds of animal carcasses
2) Hospitals
3) Hotels
4) Stations
5) Industries
5. TECHNICAL PARAMETER
Model |
WFS-30 |
WFS-50 |
WFS-150 |
WFS-300 |
WFS-500 |
Burning capacity |
20-30kg/time |
30-50kg/time |
100-150kg/time |
200-300kg/time |
300-500kg/time |
incinerator Size (L*H*B) |
1.45*0.9*1.75m |
1.8*1.15*3m |
2*1.4*3.5m |
2.2*1.4*3.8m |
3*2*4.8m |
imputing mouth width (mm) |
480*600 |
620*800 |
760*960 |
900*1100 |
1080*1280 |
Chimney external diameter (mm) |
280 |
280 |
300 |
400 |
460 |
draught fan |
0.37w |
0.37w |
0.5w |
1.1kw |
1.1kw/0.55kw |
Combustion
improver device |
0.11kw
Oil consumption: 4-6kg/h |
0.11kw
Oil consumption: 4-10kg/h |
0.11kw
Oil consumption: 4-10kg/h |
0.22kw
Oil consumption: 7-14kg/h |
0.22kw
Oil consumption: 7-14kg/h |
Re-burning device |
0.11 kw
Oil consumption 4-6 kg/h |
0.11kw
Oil consumption: 4-10kg/h |
0.22kw
Oil consumption: 7-14kg/h |
0.37kw
Oil consumption: 10-20kg/h |
0.22kw
Oil consumption: 15-26kg/h |
voltage |
380v/220v |
380v/220v |
380v/220v |
380v/220v |
380v/220v |
Weight(kg) |
2300 |
4000 |
7000 |
8000 |
13000 |
FAQ
1.Q:Are you a factory or trading company?
A: We are a factory, we have rich experience for manufacuring water processing equipment for more than 10 years.
2.Q:Where is your factory located? How can i visit there?
A: Our factory is located in No.1137 Guanhai road , Zhucheng City, Shandong Province, China. It is about 2 hours from Qingdao airport. We can pick you up if you need, welcome to visit our factory.
3.Q: Do you have minimum order quantity request?
A: No minimum order, but it can get a discount if you order a large quantity.
4.Q: Do you have certificates?
A: Yes, we have ISO,SGS,CE certificate.
5.Q: Can you meet my special requirements for my products?
A: Yes, we have a professional design team. We can provide drawings according to your requirements.
6. Q:How to buy your idea products?
A:You can provide us your water sources, water quality, flow rate and ground area (connect us for more details).
7. Q:How to pay?
A: TT and L/C are acceptable and TT will be more appreciated. 30% deposit before producing, 70% balance before loading by TT.
8. Q:What is the delivery time?
A: It depends on order quantities. Generally speaking, the delivery time will be within 4 to 6 weeks.
9. Q: How to pack the products?
A: We use standard package. If you have special package requirements, we will pack as required, but the fees will be paid by customers.
10. Q: How to keep your equipments from corrosion?
A: We use the world-famous paint, like SigmaCoatings,PainBow,etc. What's more, we paint strictly according to the standard process.
11. Q: How do you manufacture your equipment ?
A:Our machining technology includes laser/plasma cutting, automatic welding,CNC cutting and bending.
12. Q:How to install after the equipments arriving destination?
A: We will provide detailed illustrations to you. If it is necessary, we will send technicians to help you. However, the visa fee, air tickets, accommodation, wages will be paid by buyers.