Small Environmental Incinerator for Medical Waste Treatment Air Purification System Hospital Equipment Medical Waste Incinerator
WFS series waste incinerator is based on Japanese technology, absorbing similar equipment at home and abroad, adopting the most advanced combustion mode of primary pyrolysis gasification + mixed combustion with surrounding air + secondary incineration + burnout treatment, with the maximum temperature of 1200 ºC, which can effectively burn virus.
4.Size Information
Model |
WFS-30 |
WFS-50 |
WFS-150 |
WFS-300 |
WFS-500 |
Burning Capacity |
20-30kg/time (3-6 times/day) |
30-50kg/time (3-6times/day) |
100-150kg/time (3-6times/day) |
200-300kg/time (3-6times/day) |
300-400kg/time(3-6times/day) |
Incinerator Size m (L*H*B) |
1.45*0.9*1.75 |
1.8*1.15*3 |
2*1.4*3.5 |
2.2*1.4*3.8 |
3*2*4.8 |
Imputing Mouth Width (mm) |
480*600 |
620*800 |
760*960 |
900*1100 |
1080*1280 |
Chimney External Diameter(mm) |
280 |
280 |
300 |
400 |
460 |
Draught Fan |
0.37kw |
0.37kw |
0.5kw |
1.1kw |
1.1kw/0.55kw |
Combustion Improver Device |
0.11kw Oil consumption: 4-6kg/h |
0.11kw Oil consumption: 4-10kg/h |
0.11kw Oil consumption: 4-10kg/h |
0.22kw Oil consumption: 7-14kg/h |
0.22kw Oil consumption: 7-14kg/h |
Re-Burning Device |
0.11 kw Oil consumption 4-6 kg/h |
0.11kw Oil consumption: 4-10kg/h |
0.22kw Oil consumption: 7-14kg/h |
0.37kw Oil consumption: 10-20kg/h |
0.37kw Oil consumption: 15-26kg/h |
Voltage |
380v/220v |
380v/220v |
380v/220v |
380v/220v |
380v/220v |
Product Application
Medical Wastes treatment: hospital wastes such as: bandage , swaps,needles, injection syringe, drop bottle, lab waste, expired drugs, infectious internal organ, napkin, diaper, mask, gloves, straps, gauze, blood vessels, organs,pharmaceutical waste, hazardous wastes , Laboratories wastes, healthcare waste.
FAQ
Q:How to buy your incinerator ?
A:You can provide the type and amount of garbage (please contact us for details). We will design the incinerator for you for free.
Q:How to pay ?
A:TT and L/C are acceptable TT will be more appreciated.
Q:What is the delivery time ?
A:It depends on order quantities .Generally speaking,the delivery time will be within 1 to 2 weeks.
Q:How to install after the equipment arriving destination ?
A:We will provide detailed illustrations to you.And we will send a technician to guide for installation and debugging.After debugging equipment ,he will teach your workers how to maintain it.