Incinerator manufacturers,domestic waste treatment device
INTRODUCTION
WFS is a incineration equipment with independent intellectual property rights developed by Shandong BETTER Environmental Protection Technology Co.Ltd. which introduced advanced Japanese waste incinerator technology and organized technical experts to tackle the problems.It is fully enclosed,compact in structure and highly efficient in incinerating which boasts reasonable process,leading technology,and a high degree of harmlessness.It is an ideal waste treatment equipment for various waste for hospitals,hotels,stations,large commercial institutions,enterprises,and institutions.
MAIN FEATURES
1.Adopting gasification incineration technology suitable for treatment of various wastes like domestic garbage ,medical garbage,various kinds of paper scraps,animal carcasses,etc.
2.Using gasification incineration,all kinds of garbage every day can be incinerated at once.
3.Making use of gasification incineration,mixed incineration,burnout treatment and other technologies to meet the national emission standards for smoke and dust.
4.Adopting fully enclosed operation to avoid secondary pollution.
5.Compact structure,small space required.
6.This series of incinerators are divided into two types by the fuel,and users can choose according to their need,diesel or gas.
7.Ash rate less than 3%.
8.2nd combustion chamber gas retention time ≥ 2s.
INCINERATOR CHARACTERISTICS
1.No visible smoke,no smell,no secondary pollution.
2.Lifetime up to 8-10 years.
3.Zero failure:low failure rate,less maintenance and operating costs.
4.Easy operation:easy to learn,easy to burn,effort-saving for everyone.
5.Negative pressure design,non-backfire,continuous feeding,and large treatment capacity.
6.High security:the open design has no risk of explosion,and has automatic water cutoff,and alarm safety system.
7.Secondary combustion,higher temperature treatment.
APPLICATION
1) All kinds of animal carcasses
2) Hospitals
3) Hotels
4) Stations
5) Industries
TECHNICAL PARAMETER
Model |
WFS-30 |
WFS-50 |
WFS-150 |
WFS-300 |
WFS-500 |
Burning capacity |
20-30kg/time |
30-50kg/time |
100-150kg/time |
200-300kg/time |
300-500kg/time |
incinerator Size (L*H*B) |
1.45*0.9*1.75m |
1.8*1.15*3m |
2*1.4*3.5m |
2.2*1.4*3.8m |
3*2*4.8m |
imputing mouth width (mm) |
480*600 |
620*800 |
760*960 |
900*1100 |
1080*1280 |
Chimney external diameter (mm) |
280 |
280 |
300 |
400 |
460 |
draught fan |
0.37w |
0.37w |
0.5w |
1.1kw |
1.1kw/0.55kw |
Combustion
improver device |
0.11kw
Oil consumption: 4-6kg/h |
0.11kw
Oil consumption: 4-10kg/h |
0.11kw
Oil consumption: 4-10kg/h |
0.22kw
Oil consumption: 7-14kg/h |
0.22kw
Oil consumption: 7-14kg/h |
Re-burning device |
0.11 kw
Oil consumption 4-6 kg/h |
0.11kw
Oil consumption: 4-10kg/h |
0.22kw
Oil consumption: 7-14kg/h |
0.37kw
Oil consumption: 10-20kg/h |
0.22kw
Oil consumption: 15-26kg/h |
voltage |
380v/220v |
380v/220v |
380v/220v |
380v/220v |
380v/220v |
Weight(kg) |
2300 |
4000 |
7000 |
8000 |
13000 |
After-Sales Service
1.Warranty is 12 months from the time machine is fully installed. In this period, under normal operating conditions, if malfunction is caused by product quality, we will provide free repairs.
2,supplied warranty including:
(1)In warranty period, if malfunction is caused by design, produce etc. quality of product, we will provide free repairs;
(2)In half year after run testing, if accessories is with quality problem and be replaced, we supply 12 months warranty for new accessories;
(3)In 7~12 months after run testing, if accessories is with quality problem and be replaced, we supply 6 months warranty for new accessories;
(4) If malfunction is caused by wrong man-made operating or natural disaster etc., it is out of our warranty scope, but we can help to relieve malfunction, your esteemed company should pay for the charge;
3,if incinerator can not meet requirement of client, we must improve within a definite time.
4.If your company needs us to send engineers to the site to guide the installation of the incinerator, Engineers Guide Service Available:USD100/day engineer salary(The engineer's accommodation and round-trip air tickets are provided by your company.)
5,below items are free of charge we supply:
(1)after incinerator is finishing completed installation, we train operating staff for client free of charge.
A,Participate in installation and debugging of incinerator, know well for technology and structure, function of incinerator etc.
B,We supply operating and maintenance instructions.
C,We supply site operation training, and common trouble removal.
6,after warranty period, we supply lifelong maintenance service and spare parts supply, and charge cost price.
7,we supply complete technology consulting and after-sale service.