Product Description
WFS series of life (medical) waste incinerator is used in a pyrolysis gasification and the most advanced around the wind mixed fuel + twice burning + burn treatment of incineration.
Model |
WFS-30 |
WFS-50 |
WFS-150 |
WFS-300 |
WFS-500 |
Burning Capacity |
20-30kg/time |
30-50kg/time |
100-150kg/time |
200-300kg/time |
300-400kg/time |
Incinerator Size (mm) (L*H*B) |
1.45*0.9*1.75 |
1.8*1.15*3 |
2*1.4*3.5 |
2.2*1.4*3.8 |
3*2*4.8 |
Imputing Mouth Width (mm) |
480*600 |
620*800 |
760*960 |
900*1100 |
1080*1280 |
Chimney External Diameter (mm) |
280 |
280 |
300 |
400 |
460 |
Draught Fan |
0.25w |
0.25w |
0.37w |
0.55kw |
0.55kw |
Combustion Improve Device |
Power: 0.12kw Oil consumption: 4-6kg/h |
Power: 0.12kw Oil consumption: 4-10kg/h |
Power: 0.18kw Oil consumption: 4-10kg/h |
Power: 0.18kw Oil consumption: 7-14kg/h |
Power: 0.25kw Oil consumption: 7-14kg/h |
Re-Burning Device |
Power: 0.18kw Oil consumption 4-6 kg/h |
Power: 0.18kw Oil consumption: 4-10kg/h |
Power: 0.25kw Oil consumption: 7-14kg/h |
Power: 0.25kw Oil consumption: 10-20kg/h |
Power: 0.25kw Oil consumption: 15-26kg/h |
Voltage |
380v/220v |
380v/220v |
380v/220v |
380v/220v |
380v/220v |
Weight(kg) |
2300 |
4000 |
7000 |
8000 |
13000 |
Direction for use
The incinerator in a combustion chamber design due to the gasfication incineration technology makes the temperature of incinerator furnace goes from 200ºC to 400ºC, never produced the combustion process clinker, slag, sintering and other problems.
In the two mixed burning chamber, it's provided with two time burning burner and tangential air-supply device.
Description of application effect
The fue gas in the high temperature combustion chamber can be fully burning and the use of rotary flow of flue gas dust removal,
incineration flue gas residence time in the furnace more than 2 secornds, the combustible gas in the flue gas and fly ash
completely burned, a dry exhaust gas purification device on the upper part of the incinerator, the adsorption of hydrogen
chioride, sulfur oxide generated in the incineration, flue gas odor components are decomposed at high temperature. With calcium
hydride filter tiles and acid gas the national"hazardous waste incineration pollution control standards( GB18484-2001)"and other
standard below the specifed value.
Packing&Shipping
Here is our product packing and shipping details.
Application
Technical support:
1. 3D operation video
2. English manual book
3. Technical drawing
4. Experienced engineers guide
Company Introduction
Better Environmental Protection Technology Co., Ltd., integrates development, research, design, production and construction of environmental protection products with the help of professional technical team in environmental protection industry. In the field of industrial and urban sewage treatment and garbage treatment, we are based on the domestic and foreign markets with excellent quality and good reputation.
Our Services & Strength
R & D team: Continuously upgrade and improve products to improve the product performance according to your needs.
Technical team: Have professional technical knowledge, provide technical guidance for you on site, assist in the installation of equipment.
Sales team: For your needs, to provide you with the most appropriate products. 24 hours free after-sales service.
Listed company with good reputation and large scale
Sewage treatment equipment manufacturer, quality strict control
The fastest delivery time, directly docking the factory, reducing your waiting time
Engineers provide professional on-site installation guidance
Rich experience, docking with government projects and garbage treatment and sewage treatment projects in various industries
Free 24-hour online after-sales service
FAQ
Q: What about your company?
A: Our company is direct incinerator manufacture factory. We have over 12 years experience of waste incinerator manufacture and application.
Q: How to buy your incinerator?
A: You can provide us the waste kind and waste quantity(connect us for more details). we will recommand you the suitable model incinerator.
Q: How to pay?
A: TT and L/C are acceptable and TT will be more appreciated. 30% deposit before producing, 70% balance before loading by TT.
Q: What is the delivery time?
A: It depends on order quantities. Generally speaking, the delivery time will be within 3 to 4 weeks.
Q: How to install after the equipments arriving destination?
A: We will provide detailed illustrations to you. And we will send a technician to guide for installation and debugging. After
debugging equipment, he will teach your workers how to use it and how to maintain it.
Q: How to visit your factory?
A: You could fly to Qingdao airport and we will pick up you to our company.