Mbr Integrated Sewage Treatment Device, Hospital Wastewater Treatment Equipment

Product Details
Customization: Available
Type: Aerators
Method: Biological Treatment

360° Virtual Tour

Diamond Member Since 2012

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

to see all verified strength labels (23)
  • Mbr Integrated Sewage Treatment Device, Hospital Wastewater Treatment Equipment
  • Mbr Integrated Sewage Treatment Device, Hospital Wastewater Treatment Equipment
  • Mbr Integrated Sewage Treatment Device, Hospital Wastewater Treatment Equipment
  • Mbr Integrated Sewage Treatment Device, Hospital Wastewater Treatment Equipment
  • Mbr Integrated Sewage Treatment Device, Hospital Wastewater Treatment Equipment
  • Mbr Integrated Sewage Treatment Device, Hospital Wastewater Treatment Equipment
Find Similar Products

Basic Info.

Model NO.
WSZ
Usage
Industrial, Home, Agriculture, Hospital
Model No.
Wsz
Color
Customized
Appilication
Water Purification
Advantage
Odourless/Clean
Certification
ISO Standard International Standard
Cod Outlet
Can Be Less Than 50mg/L
Treating Capacity
Above 0.5m3/H
Painting
Epoxy Painting
Warranty
1year
Delivery Time
20days
MOQ
1set
After Sales Service
Online Support;Engineers Assistance
Transport Package
Seaworthy Package
Specification
carbon steel
Trademark
BETTER
Origin
Shandong, Zhucheng
HS Code
8421299090
Production Capacity
20sets Per Month

Product Description

MBR integrated sewage treatment device,Hospital wastewater treatment equipment
 

1.Product Description

Have you found a suitable treatment method for domestic and industrial wastewater treatment?If you hasn't,maybe i can provide a wonderful idea to deal  this .
WSZ Series Sewage Treatment Equipment will be one of your best choices.
Advantage:Compact design, small area, low cost, reliable operation, high automation as well as simple maintenance while discards defects in traditional sewage treatment technology.
WSZ treat wastewater in batches within the same vessel.This means that the bioreactor and final clarifier are not separated in only space but also in a timed sequence.The installation consists of at least two identically equipped tanks with a common inlet, which can be alternated between them.While one tank is in settle/decant mode the other is aerating and filling.
This is the new biological processes that used to remove contaminants and produce treated wastewater (or treated effluent) that is safe enough for release into the environment.
Activated sludge/ biofilm process represents a renewable process with the combination of activated sludge process and biofilm process.The activated sludge is not easy to be carried away by the water.
It is concluded that the combined activated sludge/ biofilm process has better resistance to shock loads, high nitrogen removal efficiency and consistent effluent quality.
Mbr Integrated Sewage Treatment Device, Hospital Wastewater Treatment Equipment

2.MBR technology advantage
MBR is a kind of new technology for waste water treatment by combining membining membrane separation technique with activated sludge method.It can be used for municipal sewage and industrial waste water treatment and substitute for secondary sedimentation tank in removing suspended particles,so as to increace nitrogen removal rate and organics degradation rate.
As a waste water treatment system features simple operation,high automation and modular design,it also has below advantage:
*
Save 50% occupying area compared with traditional system.
*Relative high MLSS value(<15g/L)and long residue time for sludge(<60days).
*Stable producing water quality for different inlet water.
*Less sludge residue reduces cost for sludge treatment.
*Low energy consumption, simple cleaning and low operation cost.
Mbr Integrated Sewage Treatment Device, Hospital Wastewater Treatment Equipment

3.Main Features:
The device can be buried below the earth's surface.The surface can be used as green land or square land.Therefore, the device covers no surface area.And there is no need for plant construction, neither heating and heat preservation.

The device use plug flow biological contact oxidation pond, the effect is better.Besides, it is smaller than active sludge pool.The applicability to the water is stronger, impact resistance performance is good, discharging water is stable, there is no sludge expansion.In addition, the new elastomeric stereoscopic materials in the oxidation pond have a higher removing rate, and also can improve the water solubility of oxygen.

Because of the low volume load of fillings in AO bio-treatment technology of the device, and microbes are in the stage of oxygen, it would produce less mud.Generally only 90 days for one sludge removal.

Except for the conventional air exhaust, the device is equipped with soil deodorization measure as well.

The device is equipped with fully automatic electric control system and equipment damage alarm system.The device has a good reliability, generally, there is no need for special management, a monthly or quarterly maintenance is ok.

3.Application:
Hotels, restaurants, nursing homes, hospitals.
Residential areas, private housing, holiday park.
Stations, airports, port terminals and ship.
Factories, mines, military, tourist, scenic.
And kinds of industrial wastewater similar with domestic wastewater.
Mbr Integrated Sewage Treatment Device, Hospital Wastewater Treatment Equipment

4.Technical Parameter:

Model WSZ
Capacity(m³/h) 0.5 1 3 5 10 20 30
Air blower Model HB-0.75HB-0.75 HB-1.1 HB-1.2 HB-4.4 HB-8.8 HB-11.5
Power(KW) 0.75 1.1 1.2 4.4 4.4*2 11.5
Pump Model 40QW7-10-0.75 40QW10-7-0.75 50QW10-10-1.1 50QW25-7-1.5 50QW42-9-2.2
Power(KW) 0.75-1.1 1.5 2.2
Inlet water BOD5mg/L 150-400
Outlet water BOD5mg/L 20-60
Floor space(m2) 4.5 6.5 12 15 35 51 76

Mbr Integrated Sewage Treatment Device, Hospital Wastewater Treatment Equipment
Mbr Integrated Sewage Treatment Device, Hospital Wastewater Treatment Equipment
Mbr Integrated Sewage Treatment Device, Hospital Wastewater Treatment Equipment
Mbr Integrated Sewage Treatment Device, Hospital Wastewater Treatment Equipment

5.Company
Mbr Integrated Sewage Treatment Device, Hospital Wastewater Treatment Equipment
Mbr Integrated Sewage Treatment Device, Hospital Wastewater Treatment Equipment
Mbr Integrated Sewage Treatment Device, Hospital Wastewater Treatment Equipment

Mbr Integrated Sewage Treatment Device, Hospital Wastewater Treatment Equipment
FAQ
 
1.Q:Are you a factory or trading company
  A: We are a factory, we have rich experience for manufacuring water processing equipment for more than 10 years.
 
2.Q:Where is your factory located? How can i visit there?
  A: Our factory is located in No.1137, Zhucheng city, Shandong Province, China. It is about 2 hours from Qingdao airport. We can pick you up if you need, welcome to visit our factory..
 
3.Q: Do you have  minimum order quantity request?
  A: No minimum order, but it can get a discount if you order a large quantity.
 
4.Q: Do you have  certificates?
  A: Yes, we have ISO,SGS certificate.
 
5.Q: Can you meet my special requirements for my products?
  A: Yes, we have a professional design team. We can provide drawings according to your requirements.

6. Q:How to buy your idea products?
   A:You can provide us your water sources, water quality, flow rate and ground area (connect us for more details).

7. Q:How to pay?
  A: TT and L/C are acceptable and TT will be more appreciated. 30% deposit before producing, 70% balance before loading by TT.

8. Q:What is the delivery time?
  A: It depends on order quantities. Generally speaking, the delivery time will be within 4 to 6 weeks.

9. Q: How to pack the products?
  A: We use standard package. If you have special package requirements, we will pack as required, but the fees will be paid by customers.

10. Q: How to keep your equipments from corrosion? 
    A: We use the world-famous paint, like SigmaCoatings,PainBow,etc. What's more, we paint strictly according to the standard process.

11. Q: How do you manufacture your equipment ?
    A:Our  machining technology  includes laser/plasma cutting, automatic welding,CNC cutting and bending.
 
12. Q:How to install after the equipments arriving destination? 
    A: We will provide detailed illustrations to you. If it is necessary, we will send technicians to help you. However, the visa fee, air tickets, accommodation, wages will be paid by buyers.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier