Efficient Smokeless Incinerator, Medical Waste Treatment Device

Product Details
Customization: Available
Condition: New
Certification: GMA, QS, FDA, ISO, CE

360° Virtual Tour

Diamond Member Since 2012

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

to see all verified strength labels (23)
  • Efficient Smokeless Incinerator, Medical Waste Treatment Device
  • Efficient Smokeless Incinerator, Medical Waste Treatment Device
  • Efficient Smokeless Incinerator, Medical Waste Treatment Device
  • Efficient Smokeless Incinerator, Medical Waste Treatment Device
  • Efficient Smokeless Incinerator, Medical Waste Treatment Device
  • Efficient Smokeless Incinerator, Medical Waste Treatment Device
Find Similar Products

Basic Info.

Model NO.
WFS
Screw
None
Treatment
Pyrolysis
Fume Retention Time
More Than 2 Seconds
Technology
Pyrolysis etc.
Burning Rate
10~500kg/Batch
Burners
Two
Weight
3-20tons
Color
Blue/Silver/Green/Black/Customized
Warranty
One Year
Feature
Environmental Protection
Ash Rate
Less 3%
Transport Package
Seaworthy Package
Specification
carbon steel
Trademark
BETTER
Origin
Zhucheng, Shandong
HS Code
8417809090
Production Capacity
20sets Per Month

Product Description

ABOUT US

14 years old direct manufacture factory,
with 10 years export experience.
Cooperated with UNDP, Ministry of Health, and many govenment Projects.


Tehcnical Support

1). 3D operation video
2). English manual book
3). Technical drawing
4). Experienced engineers guide

      100% Guarantee of no black smoke

(10-500kgs/batch, customized)      Fuel: Diesel Oil for Natural Gas or LPG


 Why choose us 

1. We consistent good quality with reasonable price.
2. Big company, good reputation, more reliable.
3. Delivery in time.
4. Over 14 years' experience since 2006.
5.Considerable after-sales service.

  
Our Services


1.24-hour a day, 365-day a year access to a toll-free health care professional hotline for questions and trouble-shooting assistance FREELY.
2.all year round on site installation and debugging service abroad with professional engineer guide and training.


Packing&Delivery

Packaging Details  export seaworthy packag
Delivery within  20 days

Efficient Smokeless Incinerator, Medical Waste Treatment Device
1. INCINERATOR OVERVIEW

WFS series of life and (medical) waste incinerator is ShanDong Better Environmental Protection Technology Co.Ltd,our company introduced the world's advanced incinerator technology, researched and organized technical experts,developed with independent intellectual property rights of garbage incineration equipment. The device is fully enclosed, with smallvolume, high burning efficiency, reasonable process, leading technology, high degree of harmless,etc, are the ideal garbage treatment equipment for all kinds of hospitals, hotels, railway stations, large commercial institutions.        

   
 2. ADVANTAGE

1) Long lifetime
2) Totally enclosed operation
3) Suitable for treating infectious waste
4) Avoid secondary pollution
5) Simple operation
6) Small size, small footprint.

3. MAIN FEATURES

1) Both gas-motivated and oil-motivated are all can be preferred according to customers' needs.
2) Gasified incineration is used for burning animal carcasses,syringe, paper waste, bandage, absorbent cotton and other medical wastes.
3) Daily waste can be burned once by gasified incineration.
4) Gasified incineration, mixed incineration and burnout treatment ensures low emission standard of dust (lower than International standard).
5) Totally enclosed operation is suitable for treating infectious waste to avoid secondary pollution.
 
 4. APPLICATION

1) All kinds of animal carcasses
2) Hospitals
3) Hotels
4) Stations
5) Industries

 5. TECHNICAL PARAMETER
 
Model WFS-30 WFS-50 WFS-150 WFS-300 WFS-500
Burning capacity 20-30kg/time  30-50kg/time 100-150kg/time  200-300kg/time  300-500kg/time
incinerator Size      (L*H*B) 1.45*0.9*1.75m 1.8*1.15*3m 2*1.4*3.5m 2.2*1.4*3.8m 3*2*4.8m
imputing mouth width (mm) 480*600 620*800 760*960 900*1100 1080*1280
Chimney external diameter (mm) 280 280 300 400 460
draught fan 0.37w 0.37w 0.5w 1.1kw 1.1kw/0.55kw
Combustion 
 improver device
0.11kw
Oil consumption: 4-6kg/h
0.11kw
Oil consumption: 4-10kg/h
0.11kw
Oil consumption: 4-10kg/h
0.22kw
Oil consumption: 7-14kg/h
0.22kw
Oil consumption: 7-14kg/h
Re-burning device 0.11 kw
Oil consumption 4-6 kg/h
0.11kw
Oil consumption: 4-10kg/h
0.22kw
Oil consumption: 7-14kg/h
0.37kw
Oil consumption: 10-20kg/h
0.22kw
Oil consumption: 15-26kg/h
voltage 380v/220v 380v/220v 380v/220v 380v/220v 380v/220v
Weight(kg) 2300 4000 7000 8000 13000

Efficient Smokeless Incinerator, Medical Waste Treatment Device
 6. INCINERATION TECHNICAL INDEX
 
Indicator waste
type
ncinerator
temperature(ºC)
Flue gas
retention time(s)
Burning Rate(%) Burned
Removal rate(%)
Thermal reduction
of incineration residue(%)
Hospital clinical 
waste
≥850 ≥2.0 ≥99 ≥99 ≤5

Efficient Smokeless Incinerator, Medical Waste Treatment Device
Efficient Smokeless Incinerator, Medical Waste Treatment Device
Efficient Smokeless Incinerator, Medical Waste Treatment Device
After-Sales Service
1.Warranty is 12 months from the time machine is fully installed. In this period, under normal operating conditions, if malfunction is caused by product quality, we will provide free repairs.

2,supplied warranty including:
(1)In warranty period, if malfunction is caused by design, produce etc. quality of product, we will provide free repairs;
(2)In half year after run testing, if accessories is with quality problem and be replaced, we supply 12 months warranty for new accessories;
(3)In 7~12 months after run testing, if accessories is with quality problem and be replaced, we supply 6 months warranty for new accessories;
(4) If malfunction is caused by wrong man-made operating or natural disaster etc., it is out of our warranty scope, but we can help to relieve malfunction, your esteemed company should pay for the charge;

3,if incinerator can not meet requirement of client, we must improve within a definite time.

4.If your company needs us to send engineers to the site to guide the installation of the incinerator, Engineers Guide Service Available:USD100/day engineer salary(The engineer's accommodation and round-trip air tickets are provided by your company.)

5,below items are free of charge we supply:
(1)after incinerator is finishing completed installation, we train operating staff for client free of charge.
A,Participate in installation and debugging of incinerator, know well for technology and structure, function of incinerator etc.
B,We supply operating and maintenance instructions.
C,We supply site operation training, and common trouble removal.

6,after warranty period, we supply lifelong maintenance service and spare parts supply, and charge cost price.

7,we supply complete technology consulting and after-sale service.
Efficient Smokeless Incinerator, Medical Waste Treatment Device
Efficient Smokeless Incinerator, Medical Waste Treatment Device
Efficient Smokeless Incinerator, Medical Waste Treatment Device
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier