Contact : Miss Conney Liu
Mobile: +86 15954432797
+86 18660617383
Shandong Better Environmental Protection Technology Co., Ltd
Sewage treatment plant
1. DESCRIPTION OF INTEGRATED SEWAGE TREATMENT DEVICE
This equipment adopts international advanced treatment process in the summary of sewage treatment plant at home and abroad, on the basis of operating experience, combined with my company's own scientific research and engineering practice, designed a kind of can be set up ground of complete sets of organic wastewater
treatment plant, It can remove BOD5 COD and NH3- N with stable and reliable performance, good treatment
effect, saving investment, automatic operation, maintenance is easy to operate, don't cover surface area, forbid to build a house, no heating of the heat preservation, etc. Above the ground can be kind of flowers, and will not affect the surrounding environment.
2. MAIN FEATHERS
1,WSZ buried sewage treatment device may be embedded below the surface, the surface can be used as green or square land, so that the device is not an area of the surface area, no build a house, but without the need for heating insulation.
2 ,WSZ- AO sewage treatment equipment consists of two sets of equipment for the steel composition,
the use of the country's first anti-corrosion coatings for corrosion protection. With acid salt gasoline
kerosene aging and abrasion resistance, band Rust. After the device is generally brushing the paint,
anti-corrosion life of up to 12 years.
3, WSZ buried sewage treatment plant of AO biological treatment process using push flow biological
contact oxidation pool, its processing effect is better than that of completely mixed or secondary and
tertiary series hybrid biological contact oxidation pool completely. With small volume, and it is better than
activated sludge pool water applicability, impact resistant performance is good, stable discharging water,
no sludge bulking, at the same time in the biological contact oxidation pool using the new elastic solid material, it has a real big surface area, microbial hanging membrane, membrane is convenient, under the condition of same organic load, higher than other fillers on the removal rate of organic matter. To improve the air in water solubility., because in the process for biological treatment of AO used the biological contact oxidation pool, its packing is
lower, the volume of the load itself in the microbial oxidation stage, therefore less sludge production. In addition,
the moisture content of sludge produced by biological contact oxidation pool is far lower than the moisture
content of sludge produced by activated sludge pool.
4,WSZ buried sewage treatment plant in addition to the regular blower sound measures (such as
vibration isolation pad, muffler, etc.), also on the inner wall of the blower room set up new sound-absorbing material, make the equipment run time below 50 decibel noise, reduce the impact on the surrounding
environment.
5,WSZ buried sewage treatment plant with soil deodorization measures, the use of reinforced concrete
structure of pool upper airway space set up soil improvement and cloth. When the stench ingredients through the layers of dissolved in the soil contains water and, in turn, because of the surface of the soil adsorption and
chemical reaction into soil, was eventually the microbes and achieve the goal of deodorization.
6, WSZ buried sewage treatment plant of form a complete set of automatic alarm system, electric control
system and equipment damage equipment reliability is good, so normally the need of personnel management,
monthly or quarterly maintenance and maintenance.
3. APPLICATION
1,Residential areas, villages, towns and villages.
2,Office buildings, shopping malls, hotels, restaurants.
3,Nursing homes, hospitals, offices, schools.
4,Troops, highways, railways, factories.
5,Mining, tourist attractions and other sewage and slaughter Similarly, aquatic products processing,
food and other small and medium scale industrial organic waste water treatment and regression
4. Technical parameter:
Item
Model |
WSZ |
0.5 |
1 |
3 |
5 |
10 |
20 |
30 |
Capacity(/h) |
0.5 |
1 |
3 |
5 |
10 |
20 |
30 |
Air blower |
Model |
HB-0.75 |
HB-1.1 |
HB-2.2 |
HB-4.4 |
HB-8.8 |
HB-11.5 |
Power(KW) |
0.75 |
1.1 |
1.2 |
4.4 |
4.4×2 |
11.5 |
Pump |
Model |
40QW7-10-0.75 |
40QW10-7-0.75 |
50QW10-10-1.1 |
50QW25-7-1.5 |
50QW42-9-2.2 |
Power(KW) |
0.75-1.1 |
1.5 |
2.2 |
BOD5 mg/L inlet water |
150-400 |
BOD5 mg/L outlet water |
20-60 |
Floor space() |
4.5 |
6.5 |
12 |
15 |
35 |
51 |
76 |
5. FAQ:
1.Q:Are you a factory or trading company
A: We are a factory, we have rich experience for manufacuring water processing equipment for more than 10 years.
2.Q:Where is your factory located? How can i visit there?
A: Our factory is located in No. 1137, Zhucheng City, Shandong Province,China. It is about 2 hours from Qingdao airport, Qingdao Train station and Weifang train station. We can pick you up if you need, welcome to visit our factory.
3.Q: Do you have minimum order quantity request?
A: No minimum order, but it can get a discount if you order a large quantity.
4.Q: Do you have certificates?
A: Yes, we have ISO,SGS certificate.
5.Q: Can you meet my special requirements for my products?
A: Yes, we have a professional design team. We can provide drawings according to your requirements.
6. Q:How to buy your idea products?
A:You can provide us your water or waste sources, water or waste quality, flow rate and ground area (connect us for more details).
7. Q:How to pay?
A: TT and L/C are acceptable and TT will be more appreciated. 30% deposit before producing, 70% balance before loading by TT.
8. Q:What is the delivery time?
A: It depends on order quantities. Generally speaking, the delivery time will be within 4 to 6 weeks.
9. Q: How to pack the products?
A: We use standard package. If you have special package requirements, we will pack as required, but the fees will be paid by customers.
10. Q: How to keep your equipments from corrosion?
A: We use the world-famous paint, like SigmaCoatings,PainBow,etc. What's more, we paint strictly according to the standard process.
11. Q: How do you manufacture your equipment ?
A:Our machining technology includes laser/plasma cutting, automatic welding,CNC cutting and bending.
12. Q:How to install after the equipments arriving destination?
A: We will provide detailed illustrations to you. If it is necessary, we will send technicians to help you. However, the visa fee, air tickets, accommodation, wages will be paid by buyers.
Contact : Miss Conney Liu
Mobile: +86 15954432797
+86 18660617383
Shandong Better Environmental Protection Technology Co., Ltd