WFS series of life (medical) waste incinerator is used in a pyrolysis gasification and the most advanced around the wind mixed fuel + twice burning + burn treatment of incineration.
Direction for use
The incinerator in a combustion chamber design due to the gasfication incineration technology makes the temperature of incinerator furnace goes from 200ºC to 400ºC, never produced the combustion process clinker, slag, sintering and other problems.
In the two mixed burning chamber, it's provided with two time burning burner and tangential air-supply device.
Description of application effect
The fue gas in the high temperature combustion chamber can be fully burning and the use of rotary flow of flue gas dust removal, incineration flue gas residence time in the furnace more than 2 secornds, the combustible gas in the flue gas and fly ash completely burned, a dry exhaust gas purification device on the upper part of the incinerator, the adsorption of hydrogen chioride, sulfur oxide generated in the incineration, flue gas odor components are decomposed at high temperature. With calcium hydride filter tiles and acid gas the national"hazardous waste incineration pollution control standards( GB18484-2001)"and other standard below the specifed value.
Model |
WFS30 |
WFS100 |
WFS200 |
WFS300 |
WFS500 |
Capacity |
20-30kg/h |
50-100kg/h |
150-200kg/h |
200-300kg/h |
300-500kg/h |
Capacity Length (m) |
1.3 |
1.7 |
1.9 |
2.1 |
3 |
Capacity Width (m) |
0.8 |
1.15 |
1.4 |
1.55 |
2 |
Capacity Height(m) |
2.28 |
3 |
3.5 |
3.8 |
4.8 |
Weight(kg) |
2000 |
4000 |
7000 |
8000 |
13000 |
Voltage |
380V/220V |
380V/220V |
380V/220V |
380V/220V |
380V/22 |
Technical support
1. 3D operation video
2. English manual book
3. Technical drawing
4. Experienced engineer
Q: What about your company?
A: Our company is direct incinerator manufacture factory. We have over 12 years experience of waste incinerator manufactur and application.
Q: How to buy your incinerator?
A: You can provide us the waste kind and waste quantity(connect us for more details). we will recommand you the suitable model incinerator.
Q: How to pay?
A: TT and L/C are acceptable and TT will be more appreciated. 30% deposit before producing, 70% balance before delivery
Q: What is the delivery time?
A: It depends on the order quantities. Generally speaking, the delivery time will be within 3 to 4 weeks.
Q: How to install after the equipments arriving destination?
A: We will provide detailed illustrations to and send a technician to guide for installation and debugging. Then will teach your workers how to use and maintain it.
Q: How to visit your factory?
A: You could fly to Qingdao airport and we will pick up you to our company.