Customization: | Available |
---|---|
Condition: | New |
Certification: | ISO, CE |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
model | WFS-30 | WFS-50 | WFS-150 | WFS-300 | WFS-500 |
Burning capacity | 20-30kg/time (3-6 times/day) | 30-50kg/time(3-6times/day) | 100-150kg/time (3-6times/day) | 200-300kg/time (3-6times/day) | 300-400kg/time(3-6times/day) |
incinerator Size m (L*H*B) | 1.45*0.9*1.75 | 1.8*1.15*3 | 2*1.4*3.5 | 2.2*1.4*3.8 | 3*2*4.8 |
imputing mouth width (mm) | 480*600 | 620*800 | 760*960 | 900*1100 | 1080*1280 |
Chimney external diameter (mm) | 280 | 280 | 300 | 400 | 460 |
draught fan | 0.37w | 0.37w | 0.5w | 1.1kw | 1.1kw/0.55kw |
Combustion improver device | 0.11kw Oil consumption: 4-6kg/h |
0.11kw Oil consumption: 4-10kg/h |
0.11kw Oil consumption: 4-10kg/h |
0.22kw Oil consumption: 7-14kg/h |
0.22kw Oil consumption: 7-14kg/h |
Re-burning device | 0.11 kw Oil consumption 4-6 kg/h |
0.11kw Oil consumption: 4-10kg/h |
0.22kw Oil consumption: 7-14kg/h |
0.37kw Oil consumption: 10-20kg/h |
0.22kw Oil consumption: 15-26kg/h |
voltage | 380v/220v | 380v/220v | 380v/220v | 380v/220v | 380v/220v |
Weight(kg) | 2300 | 4000 | 7000 | 8000 | 13000 |
1.Q:Are you a factory or trading company
A: We are a factory, we have rich experience for manufacuring water processing equipment for more than 10 years.
2.Q:Where is your factory located? How can i visit there?
A: Our factory is located in No. 1137 Guanhai Road, Zhucheng City, Shandong Province,China. It is about 2 hours from Qingdao airport or train station. We can pick you up if you need, welcome to visit our factory.
3.Q: Do you have minimum order quantity request?
A: No minimum order, but it can get a discount if you order a large quantity.
4.Q: Do you have certificates?
A: Yes, we have ISO,SGS certificate.
5.Q: Can you meet my special requirements for my products?
A: Yes, we have a professional design team. We can provide drawings according to your requirements.
6. Q:How to buy your idea products?
A:You can provide us your water sources, water quality, flow rate and ground area (connect us for more details).
7. Q:How to pay?
A: TT and L/C are acceptable and TT will be more appreciated. 30% deposit before producing, 70% balance before loading by TT.
8. Q:What is the delivery time?
A: It depends on order quantities. Generally speaking, the delivery time will be within 3 to 4 weeks.
9. Q: How to pack the products?
A: We use standard package. If you have special package requirements, we will pack as required, but the fees will be paid by customers.
10. Q: How to keep your equipments from corrosion?
A: We use the world-famous paint, like SigmaCoatings,PainBow,etc. What's more, we paint strictly according to the standard process.
11. Q: How do you manufacture your equipment ?
A:Our machining technology includes laser/plasma cutting, automatic welding,CNC cutting and bending.
12. Q:How to install after the equipments arriving destination?
A: We will provide detailed illustrations to you. If it is necessary, we will send technicians to help you. However, the visa fee, air tickets, accommodation, wages will be paid by buyers.