Advanced Hospital Waste Incineration System for Eco-Conscious Facilities

Product Details
Customization: Available
After-sales Service: Video Technical Support, Field Installation,
Warranty: 1 Year

360° Virtual Tour

Diamond Member Since 2012

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

to see all verified strength labels (23)
  • Advanced Hospital Waste Incineration System for Eco-Conscious Facilities
  • Advanced Hospital Waste Incineration System for Eco-Conscious Facilities
  • Advanced Hospital Waste Incineration System for Eco-Conscious Facilities
  • Advanced Hospital Waste Incineration System for Eco-Conscious Facilities
  • Advanced Hospital Waste Incineration System for Eco-Conscious Facilities
  • Advanced Hospital Waste Incineration System for Eco-Conscious Facilities
Find Similar Products

Basic Info.

Model NO.
WFS
Certification
ISO, CE
Automation
Semi-Automatic
Screw
Single-Screw
Treatment
Burning
Name
Animal Pet Waste Incinerator
Raw Material
Raw Material/Carbon Steel
Treatment Capacity
20-500kg/Time
Color
Black/Slivery/Customized by Clients
Fuel
Diesel Oil/Gas
Function
General Garbage Disposal
Application
Treatment of Industrial Waste Domestic
Power
0.37kw
Weight (Kg)
3000 Kg
Operation
Smi-Automatic
Transport Package
Seaworthy Package or Customized
Specification
Motor, Engine, Chimney, Burner
Trademark
BETTER
Origin
Shandong, China
HS Code
8421299090
Production Capacity
50 Set/Sets Per Month

Product Description

Advanced Hospital Waste Incineration System for Eco-Conscious Facilities
Advanced Hospital Waste Incineration System for Eco-Conscious Facilities

Description:

WFS Series Waste Incinerator is a kind of machine that was developed on the basis of Japanese technology,
absorbs advantages of similar equipment both at home and abroad. It features unique and advanced merits with
compact size, high burning effect, reasonable burning technology, high degree of non-harm etc.It is an ideal choice
for waste treatment of hospitals, hotels and various areas.

.Advanced Hospital Waste Incineration System for Eco-Conscious Facilities


Advanced Hospital Waste Incineration System for Eco-Conscious Facilities
Features:

(1) Gasified pyrolysis incineration is used for burning many kinds of waste.

(2) Waste can be burned once everyday by gasified incineration.

(3) Gasified incineration, mixed incineration and burnout treatment ensures low emission standard of dust,dioxin etc.

(4) Totally enclosed operation is suitable for treating infectious waste to avoid secondary pollution.

(5) Compact structure and small land occupation.


Advantage:
1
Efficient 
2
long time 
3
discharge 
4
environmentally friendly 
5
no smoke and no waste 
6
good quality and beautiful
7
Wide range of waste disposal

Application:       

1.Hospital medical waste 2. Waste incineration plants 3.Home waste 4.Infectious diseased animal body/fur/hair 5.Industrial waste,etc

Advanced Hospital Waste Incineration System for Eco-Conscious Facilities 
Advanced Hospital Waste Incineration System for Eco-Conscious Facilities
Advanced Hospital Waste Incineration System for Eco-Conscious Facilities
Advanced Hospital Waste Incineration System for Eco-Conscious Facilities
Advanced Hospital Waste Incineration System for Eco-Conscious Facilities
Advanced Hospital Waste Incineration System for Eco-Conscious Facilities

Advanced Hospital Waste Incineration System for Eco-Conscious Facilities


Advanced Hospital Waste Incineration System for Eco-Conscious FacilitiesAdvanced Hospital Waste Incineration System for Eco-Conscious Facilities
                                    Q: How to buy your incinerator?
                                    A: You can provide us the waste kind and waste quantity(connect us for more details). we will recommand you the suitable                                               model incinerator.
 
                                    Q: How to pay?
                                    A: TT and L/C are acceptable and TT will be more appreciated. 30% deposit before producing, 70% balance before loading by                                          TT. 

                                    Q: What is the delivery time?
                                    A: It depends on order quantities. Generally speaking, the delivery time will be within 3 to 4 weeks.

                                   Q: How to install after the equipments arriving destination?
                                   A: We will provide detailed illustrations to you. And we will send a technician to guide for installation and debugging. After                                                 equipment, he will teach your workers how to use it and how to maintain it.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier