• Industrial Oily Waste Sludge Dewatering Equipment Sewage Treatment Screw Dewatering Press
  • Industrial Oily Waste Sludge Dewatering Equipment Sewage Treatment Screw Dewatering Press
  • Industrial Oily Waste Sludge Dewatering Equipment Sewage Treatment Screw Dewatering Press
  • Industrial Oily Waste Sludge Dewatering Equipment Sewage Treatment Screw Dewatering Press
  • Industrial Oily Waste Sludge Dewatering Equipment Sewage Treatment Screw Dewatering Press
  • Industrial Oily Waste Sludge Dewatering Equipment Sewage Treatment Screw Dewatering Press

Industrial Oily Waste Sludge Dewatering Equipment Sewage Treatment Screw Dewatering Press

After-sales Service: Yes
Warranty: 1 Year
Type: Flotation Machine
Method: Combined Treatment
Usage: Industrial, Home, Agriculture, Hospital
Capacity: 3-50 T/H
Customization:
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2012

Suppliers with verified business licenses

Shandong, China
to see all verified strength labels (22)

Basic Info.

Model NO.
BEA
Operation
24hours Automitic Running
Color
Customized
Voltage
380V/220V
Transport Package
Seaworthy Package
Specification
carbon steel
Trademark
BETTER
Origin
China
Production Capacity
600sets/Year

Product Description



The multi-plate screw press, which in controlled by the electric control cabinet,
allows automatic continuous operation of sludge flocculation, thickening, dewatering and the filtrate discharging.
Suitable for sludge dewatering of various industrial waste water.

 
Industrial Oily Waste Sludge Dewatering Equipment Sewage Treatment Screw Dewatering Press
 

 
Industrial Oily Waste Sludge Dewatering Equipment Sewage Treatment Screw Dewatering Press
 


1. Dosing tank      2. dewatering part    3. thickening part    
4.  electric control cabinet     5.mixer    6.  motor    7. Reducer    8. dry sludge out


 
Industrial Oily Waste Sludge Dewatering Equipment Sewage Treatment Screw Dewatering Press
 




Due to the movement of fixed rings and moving rings, multi-plate Screw Press allows continuous operation in 24 hours with no blocking.
It is especially good at dealing oily sludge. Moreover, it doesn't need additional water to clean the equipment , so that there is no secondary pollution.

 
Industrial Oily Waste Sludge Dewatering Equipment Sewage Treatment Screw Dewatering Press
 
 
 
Model Dimensions(L*W*H mm) Power(kw) Weight(kg)
BEA-131 1816*750*1040 0.35 194
BEA-132 2065*900*1040 0.45 275
BEA-201 2500*680*1450 0.74 380
BEA-202 2500*930*1450 1.1 470
BEA-301 3200*970*1790 0.92 820
BEA-302 3600*1200*1790 1.65 1350
BEA-303 3850*1600*1790 2.2 1820
BEA-351 4000*750*2000 1.3 950
BEA-352 4200*1200*2000 2.25 1300
BEA-353 4350*1700*2000 3.35 1680
BEA-401 4200*850*2100 2.05 1270
BEA-402 4350*1450*2100 3.75 2350
BEA-403 4500*2050*1960 5.6 3870
BEA-404 4600*2250*1960 8.2 5230


 
Industrial Oily Waste Sludge Dewatering Equipment Sewage Treatment Screw Dewatering Press
 


Features
1. Automatic continuous operation  
2. Compact design with flocculation and dewatering
3. Low power and water consumption
4. Low operation cost
5. No filter cloth, no clogging
6. No need for sludge thickener
 7. Easy operation and maintenance
 8. No vibration and noise



 
Industrial Oily Waste Sludge Dewatering Equipment Sewage Treatment Screw Dewatering Press
 


Technical Support:
1)English manual book
2) Technical drawing
3)Experienced engineers guide
4)Product warranty: Usually, our product warranty is 18 months after leaving factory or 12 months after installation.
5)Installation: If the project needs our installation guidance, we can send our engineer and translator.




 
Industrial Oily Waste Sludge Dewatering Equipment Sewage Treatment Screw Dewatering Press
 


FAQ
Q: How to buy your product?
A: You can provide us the waste kind and waste quantity(connect us for more details). we will recommend you the suitable product.
Q: How to pay?
A: TT and L/C are acceptable and TT will be more appreciated. 30% deposit before producing, 70% balance before loading by TT.
Q: What is the delivery time?
A: It depends on order quantities. Generally speaking, the delivery time will be within 3 to 4 weeks.
Q: How to install after the equipments arriving destination?
A: We will provide detailed illustrations to you. And we will send a technician to guide for installation and debugging. After
debugging equipment, he will teach your workers how to use it and how to maintain it.
Q: How to visit your factory?
A: You could fly to Qingdao airport and we will pick up you to our company.
 
 
Industrial Oily Waste Sludge Dewatering Equipment Sewage Treatment Screw Dewatering Press
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now