Screw Press Industrial Sludge Dewatering Machine with Continuous Operation

Product Details
Customization: Available
After-sales Service: Online Support
Warranty: 1year
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make at Made-in-china.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.

360° Virtual Tour

Secured Trading Service
Diamond Member Since 2012

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

to see all verified strength labels (23)
  • Screw Press Industrial Sludge Dewatering Machine with Continuous Operation
  • Screw Press Industrial Sludge Dewatering Machine with Continuous Operation
  • Screw Press Industrial Sludge Dewatering Machine with Continuous Operation
  • Screw Press Industrial Sludge Dewatering Machine with Continuous Operation
  • Screw Press Industrial Sludge Dewatering Machine with Continuous Operation
  • Screw Press Industrial Sludge Dewatering Machine with Continuous Operation
Find Similar Products

Basic Info.

Model NO.
BDL
Method
Chemical Treatment
Usage
Industrial, Home, Agriculture, Hospital
Material
Stainless Steel
Colour
Silver
Delivery Time
20days
Name
Screw Press Industrial Sludge Dewatering Machine W
Transport Package
Seaworthy-Package
Specification
Customized
Trademark
Better
Origin
China
HS Code
8421299090
Production Capacity
50sets/Month

Packaging & Delivery

Package Size
1.00cm * 2.00cm * 1.00cm
Package Gross Weight
1.000kg

Product Description

We always have the interest of the customers at heart.
Screw Press Industrial Sludge Dewatering Machine with Continuous Operation

Description:
Volute sludge dewatering machine can be widely used in municipal sewage treatment engineering and water treatment systems in petrochemical, light industry, chemical fiber, paper, pharmaceutical, leather and other industrial industries. The actual operation shows that the volute sludge dewatering machine can create considerable economic and social benefits for customers. 

Working principle:
1. Concentration: When the screw pushes the shaft to rotate, the multiple solid laminated plates set on the periphery of the thrust shaft move relative to each other. Under the action of gravity, water is filtered out from the gaps of the relatively movable laminated plates to achieve rapid concentration.
2. Dehydration: The concentrated sludge moves forward with the rotation of the screw shaft; along the mud cake outlet direction, the pitch of the screw shaft gradually becomes smaller, the gap between the ring and the ring also gradually becomes smaller, the volume of the spiral cavity Continuously shrinking; Under the action of the back pressure plate at the outlet, the internal pressure gradually increases. Under the continuous driving of the screw pushing shaft, the water in the sludge is squeezed and discharged, the solid content of the filter cake is continuously increased, and finally the sludge is realized. Continuous dehydration.
3. Self-cleaning: The rotation of the screw shaft promotes the continuous rotation of the swimming ring. The equipment relies on the movement between the fixed ring and the moving ring to achieve a continuous self-cleaning process, thereby cleverly avoiding the common plugging problem of the traditional dewatering machine.

Applications
1. Suitable for sludge in municipal sewage, food, beverage, chemical industry, leather, welding material, papermaking, printing and dyeing, pharmaceutical and other industries.
2. Suitable for dehydration of high and low concentration sludge. When sludge is dehydrated at a low concentration (2000 mg/L), there is no need to build a concentration tank or a storage tank, which reduces the construction cost and reduces the release of phosphorus and the generation of anaerobic odors.

Advantages:
1.Small design
1). Compact design, the dehydrator contains electric control cabinet, metering tank, flocculation mixing tank and dewatering machine main body.
2). It occupies a small space and is easy to maintain and replace; it is small in weight and easy to handle.
2.Not easy to plug
1). With self-cleaning function. It is not necessary to clean the filter to prevent clogging of the filter, reduce the amount of flushing water, and reduce the burden on the internal circulation.
2). Good at dehydration of oily sludge.
3.Low speed operation
1). The rotation rate of the screw shaft is about 2~3 rpm, and the power consumption is low.
2). Less faults, less noise and vibration, safe operation.
4.simple operation
1). Through the electric control cabinet, it can be linked with the bubble machine, mud pump, and dosing pump to achieve continuous 24-hour operation.
2). Short maintenance time and simple maintenance.
5.Durable
1). The body is made of stainless steel almost all of which can maximize the service life.
2). The replacement parts are only the screw shaft and the traveling ring, and the work time is long.

 Technical parameter:
 
Model Dimensions(mm) Power
(kw)
Weight(kg)
L W H Empty Operation
BDL-101 1756 700 1540 0.65 250 650
BDL-102 1756 900 1540 0.7 300 800
BDL-131 1757 700 1540 0.7 265 665
BDL-132 1757 900 1540 0.8 330 830
BDL-133 1847 1100 1540 0.9 400 1050
BDL-202 2485 1180 1728 1.45 850 1800
BDL-203 2591 1470 1728 1.8 1055 2355
BDL-204 2665 1780 1728 2.7 1450 3100
BDL-205 2741 2085 1728 2.9 1800 3700
Screw Press Industrial Sludge Dewatering Machine with Continuous Operation
Screw Press Industrial Sludge Dewatering Machine with Continuous Operation
Screw Press Industrial Sludge Dewatering Machine with Continuous Operation
Screw Press Industrial Sludge Dewatering Machine with Continuous Operation

 Customers from different countries:
Screw Press Industrial Sludge Dewatering Machine with Continuous Operation
Screw Press Industrial Sludge Dewatering Machine with Continuous Operation
Honor of enterprise:
Screw Press Industrial Sludge Dewatering Machine with Continuous Operation
              Screw Press Industrial Sludge Dewatering Machine with Continuous Operation

If you need any further assitance, please feel free to contact Rachel!

FAQ

1.Q:Are you a factory or trading company?
  A: We are a direct factory, we have rich experiences for manufacturing waste treatment plants for more than 17 years.
2.Q:Where is your factory ? How can i visit there?
  A:  Our factory is located in No.1501, Zhucheng city, Shandong Province, China. It is about 2 hours from Qingdao airport. We can pick you up if you need, welcome to visit our factory.
3.Q: Do you have  minimum order quantity request?
  A: No minimum order, but it can get a discount if you order a large quantity.
4.Q: Do you have  certificates?
  A: Yes, we have ISO,SGS certificate.
5.Q: Can you meet my special requirements for my products?
  A: Yes, we have a professional design team. Drawings can be provided according to your requirements.
6. Q:How do I buy your  products?
   A:You can provide us your water sources, water quality, flow rate and ground area (contact us for more details).
7. Q:How do I pay?
  A: TT and L/C are acceptable and TT will be more appreciated. 30% paid for deposit by T/T before production, 70% balance to be paid by TT before shipment.
8. Q:What is the delivery time?
  A: It would largely depend on the quantity of order and the item you want.. Generally speaking, the delivery time will be within 4 to 6 weeks.
9. Q: How do you pack the products?
  A: We use standard package. If you have special package requirements, we will pack as required, but the fees will be paid by customers.
10. Q: How do you keep your equipment from corrosion? 
    A: We use the world-famous paint, like SigmaCoatings, PainBow,etc. What's more, we paint strictly according to the standard process.
11. Q: How do you manufacture your equipment ?
    A:Our  machining technology  includes laser/plasma cutting, automatic welding,CNC cutting and bending.
12. Q:How do we install after the equipment arriving destination? 
    A: Detailed installation drawing can be provided for you. If it is necessary, we will send technicians to help you. However, the visa fee, air tickets, accommodation, wages will be paid by buyers.



 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now