Integrated Sewage Treatment Equipment

Product Details
Customization: Available
After-sales Service: Video Technical, Online Support
Warranty: 1 Year

360° Virtual Tour

Diamond Member Since 2012

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

to see all verified strength labels (23)
  • Integrated Sewage Treatment Equipment
  • Integrated Sewage Treatment Equipment
  • Integrated Sewage Treatment Equipment
  • Integrated Sewage Treatment Equipment
  • Integrated Sewage Treatment Equipment
  • Integrated Sewage Treatment Equipment
Find Similar Products

Basic Info.

Model NO.
WSZ
Method
Combined Treatment
Usage
Industrial, Home, Agriculture, Hospital
Model No.
Wsz
Material
Carbon Steel & Fiberglass
Size
Customerized
Color
Blue/Silver/Green/Black
Vltage
220V/380V
Authorized Certificate
ISO9001; SGS;BV;National Patent
Floor Space(M²)
4.5-102
Inlet Water BOD5(Mg/L)
150-400
Outlet Water BOD5(Mg/L)
20-60
Delivery Time
30-40days
Service Life
>10years
Transport Package
Sea Worthy Package
Specification
ISO standard/ international Standard
Trademark
Better
Origin
Shandong, China
HS Code
8421299090
Production Capacity
100sets/Year

Product Description


Integrated Sewage Treatment EquipmentProduct Description
Integrated Sewage Treatment Equipment1.WSZ OVERVIEW

The waste water treatment machine is developed on the basis of operational experience of sewage treating device at home and broad with advanced biological treating method. while combing our own research and practice.

lt can remove BOD5,COD,NH3-N with stable performance and effective treating capacity, characterristics of autorun and non-floor occupation saves cost and enjoy easy maintenance. Grass and flowers can be planted on the surface,so the environment won't be affected.

Water outlet quality meets national discharge standard and reclamed water reuse system can be designed together with underground sewage disposal system according to client's actual needs.



2. MAIN FEATURES

1. WSZ type complete device for sewage treatment is buried underground and greening can be carried out to the surface above the equipment. It is not necessary to construct house, maintain heat and warmth retention. The anti-corrosion manufacturing can be carried out to the equipment with less than 5t/h water quantity by adopting the fiber glass or A3 steel board.

2. The secondary biological contact oxidation treatment process adopts the blast aeration. The activated sludge owns small volume and excellent adaptability to water quality. The influent water quality is stable without producing sludge swell.

3. The reaction tank utilizes the biological touch oxidation method and sludge discharge (the night cart is used for suction or dehydration for sludge cake for out transportation) needs carrying out for only three months (90 days).

4. The whole treatment equipment does not need establishing professionals for management under general circumstance, and only maintenance is entailed for the equipment at the proper time.

5. It owns quite strong adaptability to the change of the water quality with a small amount.

6. The compressed container, air compressor, circulation pump and other equipment become unnecessary, therefore, the investment cost has been reduced dramatically.

7. The power needed is low with fewer maintenance and artificial operation. ZWF is a process of oxygen exhaust and the odor problem produced by sludge has been resolved.

Integrated Sewage Treatment Equipment3.WSZ APPLICATION

1. Hotel, restraint, sanatorium and hospital.

2. Residence community, village and town.

3. Station, air port, sea port wharf and ship.

4. Factory, mine, tourist side and scenic spot.

5. Various industrial sewage similar to the domestic sewage



4.TECHNICAL PARAMETER
 
WSZ
Model 0.5 1 3 5 10 20 30
Capacity (m3/h) 0.5 1 3 5 10 20 30
Air blower Model HB-0.75 HB-1.1 HB-1.2 HB-4.4 HB-8.8 HB-11.5
Power 0.75 1.1 1.2 4.4 4.4*2 11.5
Pump Model 40QW-10-0.75 40QW-10-7-0.75 50QW10-10-1.1 50QW25-7-1.5 50QW25-7-1.5 50QW42-9-2.2
Power 0.75-1.1 1.5 2.2
Inlet water BOD5
mg/L
150-400
Outlet water BOD5
mg/L
20-60
Floor space 4.5 6.5 12 15 35 51 76


5.FLOW CHAR

 

Integrated Sewage Treatment EquipmentIntegrated Sewage Treatment Equipment

PACKAGING AND TRANSPORTATION
Normally the DAF will be shipped without package, but we can pack them according to cusomers' requirements.
 
Integrated Sewage Treatment Equipment
Integrated Sewage Treatment Equipment


CUSTOMER PHOTOS
 
Integrated Sewage Treatment Equipment
Integrated Sewage Treatment Equipment

COMPANY INTRODUCTION


Integrated Sewage Treatment Equipment

ABOUT US


Shandong Better company was established 15 years ago,our products have been obtained the ISO 9001.

Cooperated with UNDP, Ministry of Health, and many govenment Projects.



TECHNICAL SUPPORT

1). English manual book
2). Technical drawing
3). Experienced engineers guide


Fully(100%) manufactured in the factory

No need secondory welding



WHY CHOOSE US

1. We consistent good quality with reasonable price.
2. Big company, good reputation, more reliable.
3. Delivery in time.
4. Over 15 years' experience since 1991.
5.Considerable after-sales service

 


FAQ

1.Q:Are you a factory or trading company?
A: We are a direct factory, we have rich experiences for manufacturing waste treatment plants for more than 15 years.

2.Q:Where is your factory ? How can i visit there?
A: Our factory is located in No.1137, Zhucheng city, Shandong Province, China. It is about 2 hours from Qingdao airport. We can pick you up if you need, welcome to visit our factory.

3.Q: Do you have minimum order quantity request?
A: No minimum order, but it can get a discount if you order a large quantity.

4.Q: Do you have certificates?
A: Yes, we have ISO,SGS certificate.

5.Q: Can you meet my special requirements for my products?
A: Yes, we have a professional design team. Drawings can be provided according to your requirements.

6. Q:How do I buy your products?
A:You can provide us your water sources, water quality, flow rate and ground area (contact us for more details).

7. Q:How do I pay?
A: TT and L/C are acceptable and TT will be more appreciated. 30% paid for deposit by T/T before production, 70% balance to be paid by TT before shipment.

8. Q:What is the delivery time?
A: It would largely depend on the quantity of order and the item you want.. Generally speaking, the delivery time will be within 4 to 6 weeks.

9. Q: How do you pack the products?
A: We use standard package. If you have special package requirements, we will pack as required, but the fees will be paid by customers.

10. Q: How do you keep your equipment from corrosion?
A: We use the world-famous paint, like SigmaCoatings, PainBow,etc. What's more, we paint strictly according to the standard process.

11. Q: How do you manufacture your equipment ?
A:Our machining technology includes laser/plasma cutting, automatic welding,CNC cutting and bending.

12. Q:How do we install after the equipment arriving destination?
A: Detailed installation drawing can be provided for you. If it is necessary, we will send technicians to help you. However, the visa fee, air tickets, accommodation, wages will be paid by buyers.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier